The production consists of the areas organized an ergonomic way from raw material storage to packing area and finished product storage.


Descripción

 

The production consists of the areas organized an ergonomic way from raw material storage to packing area and finished product storage.

Production structure:

1 – Raw material preparation area - crushing, mixing;
2 – Briquetting area;
3 – Drying area;
4 – Packing area;
5 – Storage area.

Payment condition – 70% downpayment and 30% upon the shipment.
Fabrication timer – 120 working days.
Warranty – 12 months.

Specification: Specification

Operational principles of the production:

The charcoal, which can be produced with the help of BIO-KILN by GreenPower, on the preparation area (1) is crushed to the required fraction on crushing machine. Received charcoal dust is removed from the crushing area by the aspiration system and is used for the further processing.

Crushing machine specification:

Crushing machine specification

Crushed charcoal is supplied to mixing machines. On the mixing area crushed charcoal is mixed with water and binder to reach the required consistency at the specific temperature conditions.

After mixing the product is supplied to the briquetting area (2) where is pressed. Briquetting machine makes a charcoal strip with a square cross-sectional shape with wall sizes 25x25mm (or any other shape according to client requirements). Pressed product (strips) is placed on conveyor belt where it is cut in cross section by means of disk blades to a length of 25mm (or other size according to client requirements).

   

Diced cubes are placed on the drying area (3) and are loaded by the operator on special pallets that are installed into the drying cabinet where the drying process takes place. Moisture is removed from the drying chamber.

After completion of drying and cooling the briquettes are transferred from the drying cabinet to the packing area (4) where they are packed with overwrap film on a special two-tier facility with further thermal setting. Package sealing avoids the penetration of foreign odors and moisture from outside.

Packing machine specification:

Packing machine specification

Packing machine configuration:

The equipment has the floor construction that consists of stacking table (1), sealing machine (2) and thermal chamber (3). Coordination of all elements is carried out with the control panel (4). All moving parts of the equipment work by means of compressed air systems. Stacking table is used for giving the packaging the desired shape and supply it for sealing. Sealing machine seals transverse and longitudinal sides of the package and supplies it for thermal setting. Thermal setting chamber sets the film with the temperature and makes dense package. After film packaging the product is placed on the storage area (5) where it is loaded into boxes, packed and shipped.

¿Por qué los clientes nos eligen?

  • SIN EMISIONES DURANTE LA OPERACIÓN
  • COMPACTACIÓN Y MOVILIDAD DEL EQUIPO
  • ALTO RENDIMIENTO (HASTA 60 TONELADAS DE CARBÓN POR MES)
  • MECANIZACIÓN COMPLETA Y AUTOMATIZACIÓN DEL PROCESO OPERATIVO
  • EL USO DE MATERIALES MODERNOS - DISEÑO CONFIABLE
  • EL NÚMERO DE PROYECCIONES NO EXCEDE EL 1%
  • CALIDAD Y GARANTÍAS - CONFIRMADAS POR
  • EQUIPO MÓVIL